Tuesday, September 13, 2011

Walls, Roof ,Windows and Stairs !!!!!

The past week has been great.  The rest of the house was framed in and the exterior walls were enclosed.  Rooms were framed in and the windows were placed.  Stairs to get to the second floor were added so now we do not have to go up via ladder (HEY).  All is looking good.  Still have the floor and roof of garage to get done.  In the next week they should have the heating and plumbing in then comes the electrical.  All is well.

Wednesday, September 7, 2011

Not sure what week we are at.

Framing is going on everyday and they think they will have it all framed and sheeted in by early next week.  Then the heating and plumbing goes in.  We spent last Saturday shopping for appliances.  Boy Lowe's is crazy on Labor day.  We have a list of things that need to be decided on, so if any of these items you know about please let us know about.  Flooring, Doors, Tile, Trim, Counter tops, Cabinets, Paint (in and out), Insulation, Water heaters, Furnace,  Carpet and selling a home.  So any help would be GREAT!!!!!




View from our sitting room - that is right we have a sitting room



This is master bed room to the right and closet and bathroom to the front of house

So you are looking at the master bed room on the side. we will have 4 windows that will look down onto side yard where the garden will be.  The front windows are for the bathroom and closet off the master bed room